PROJECT SUMMARY
Nigerian Bottling Company Ltd (A member of Coca-Cola Hellenic Group) has selected us to carry out ASHRAE level 2 and 3 energy audit for NBC Ikeja Plant.
Scope of the Project:
• Energy survey and inventory analysis
• Walk through audit and interviews
• Installed system test
• Development of tariff structure to cover the O & M of the system based on impressive RoI and willingness to pay
Services:









